Skip to content
Stars Over the River Drin

Stars Over the River Drin

100
Balasaur Score
Apex

1978 · Movie · 1h 9m

The read

It runs a compact 1h 9m.

Synopsis

After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.

Ratings

TMDB10/10

1 audience votes

Key crew

Cast

Stills

Themes

workeralbania